TROLLEY MOUNTING INSTRUCTIONS
1.) Insert the trolley mounting bolts into the door grid top horizontal.
2.) Install the trolleys and adjust the nuts on the pendant bolts until there is approximately one inch between the trolley bolt head and the door grid top horizontal. Fig 8.
INSTALL CANNON BALL TRACK PER SPECIFICATION SHEET
3.) After hanging doors and adjusting to required height, insert sheet metal screws through the washered nuts into the horizontal member as shown in Fig. 8.
4.) When using wood horizontals use a nail as shown in Fig. 9.
5.) Adjust the offset pendant bolts so door hangs flush against side of building.
6.) Tighten the split lock nuts on the offset pendant bolts to lock trolleys in operating position.